RE:GEN Group – Solar PV & Battery Installation, Doxford Park
Client: RE:GEN Group
Year: 2023
System Size: 52.1 kWp Solar PV with Battery Storage
Panels Installed: 142
Inverter & Battery Solution: Solax
Estimated Annual Generation: 43,000 kWh
Estimated Annual CO₂ Savings: 9.2 tonnes
Funding: Self-funded
The Challenge
RE:GEN Group sought to decarbonise their new head office at Doxford Park and reduce reliance on grid electricity. Beyond energy performance, the client wanted the installation to be visually impactful by incorporating their company logo into the rooftop solar PV array, adding complexity to both design and delivery.
Our Solution
Blue Leaf Energy designed and installed a 52.1 kWp Solar PV system with integrated battery storage, tailored to meet the client’s operational and branding objectives. The system included:
- 142 high-performance panels strategically configured to form RE:GEN’s logo within the array.
- A Solax inverter and battery solution to optimise generation, storage, and on-site usage.
- A bespoke design and installation approach to balance aesthetics, structural integrity, and system efficiency.
- Close coordination with the client throughout to ensure technical excellence while achieving the desired visual impact.
Funding & Support
The project was self-funded by RE:GEN Group, with Blue Leaf Energy providing end-to-end design, installation, and commissioning services.
The Results
- Forecasted 66% reduction in annual electricity consumption at the head office.
- 43,000 kWh of renewable energy generated each year.
- 9.2 tonnes of CO₂ saved annually, supporting corporate Net Zero commitments.
- A distinctive solar PV array showcasing RE:GEN’s brand identity while demonstrating sustainability leadership.
Impact
This installation highlights how renewable energy systems can deliver both functional and visual impact. RE:GEN Group now benefits from significantly reduced operating costs and carbon emissions, while their customised rooftop array stands as a visible statement of their commitment to sustainability and innovation.
INCLUDE VIDEO AT THE TOP OF THE PAGE
BLE currently deliver the Out of Hours Standby Cover for Newcastle City Council’s District Heating Systems & Public Buildings (contract until December 2026), including critical infrastructure such as Byker District Heating alongside a diverse portfolio of NCC properties across the city—Residential, Commercial, Sheltered Housing, Care Homes and Public Buildings.
Our services also include the secondary side at Riverside Dene District Heating Network.
Key elements of our current responsibilities at Byker include:
Out of Hours Operation and support for:
-3 x 6 MW gas-fired boilers
-1 x 1 MW biomass boiler
-1 x 1 MW CHP engine
-Over 4.5 km of primary subterranean pipework, 5 valve pits, and 28 km of secondary heating infrastructure
-Shipley Street Boiler House- 3 x 5 megawatt oil fired boilers (back up for the site).
-Reactive call-outs and fault repairs, including BMS diagnostics and system rebalancing
– Electronic job reporting, performance tracking, and remote fault diagnostics to minimise downtime
This contract directly demonstrates our capability to manage complex, multi-fuel heating systems and to respond effectively under pressure and during unsocial hours— core requirements for Riverside Dene.
Recent relevant repairs include Riverside Dene. As part of our current contract, Blue Leaf Energy Engineers recently completed repairs at The Hawthorns (secondary side), within the Riverside Dene scheme. This practical, up-to-date engagement further strengthens our familiarity with the specific site infrastructure and conditions.
Get in Touch
Email: info@blueleafenergy.co.uk
Tel: 0330 222 0307
Address:
Blue Leaf Energy Services Ltd
Unit 33
North Tyne Industrial Estate
Newcastle upon Tyne
NE12 9SZ
Get a Free Quote & Energy Report
For your business or home